Outer Banks Power Outage

Let’s take action.
together we can fight.

"*" indicates required fields

Tell us about your case and get a
free evaluation!

This field is for validation purposes and should be left unchanged.

Whitfield Bryson LLP (WB) has filed one of the first Class Action complaints in the Eastern District of North Carolina arising from the Bonner Bridge power outage. The massive loss of power was caused by a construction mishap that severed the area’s main power lines on July 27, 2017. WB represents businesses property owners in Hatteras and Ocracoke.

WB expects this outage to severely impact home and business owners who rely on the Outer Banks tourism season for income.

More information is expected to be released as it becomes available.

ABOUT THE OUTER BANKS POWER OUTAGE

On the morning of Thursday, July 27, a power outage for the entirety of Hatteras and Ocracoke Island occurred when PCL Construction, the company, building the new Bonner Bridge, accidentally drove a steel casing into two transmission lines of Cape Hatteras Electric Cooperative’s (CHEC) underground transmission cables on the south side of Oregon Inlet.

CHEC is reporting an expected timeline for a complete repair ranges from one to two weeks. CHEC is concurrently working to expand the temporary generation service on Hatteras Island in order to accommodate a staged re-entry of visitors.

Click Here to view official complaint

CLASS ACTIONS PROVE, TIME AND AGAIN, THERE’S POWER IN NUMBERS.

Let’s start talking about your case right now with a free consultation!

If you were affected by the power outage in the Outer Banks, find out how we can help you today.

Get in touch

Toll free: 1-855-926-2889

Email: info@wbmllp.com

Follow us:

I feel like they really care about me. I consider them good friends.

— Wes Mullinax —
logo logo logo logo logo logo logo logo logo logo logo logo logo